Geotechnics · Settlement

Consolidation time factor Tv

  • Type: Property
  • Version 1
  • reviewed on 11/12/2026

Dimensionless time factor for one-dimensional Terzaghi consolidation: Tv = cv · t / d².

Tv=cv⋅td2\displaystyle T_{v} = \frac{c_{v} \cdot t}{d^2}
Apply in CALC

Catalog formula, not a design. Check input values, coefficients, and limits against the standard and its national annex.

dTvtcv

Formula and quantities

SymbolNameUnitNote
cv\displaystyle c_{v}Coefficient of consolidationm²/s
t\displaystyle tElapsed time since load applications
d\displaystyle dLength of drainage drainage pathm
Tv\displaystyle T_{v}Consolidation time factor T_v–Result

Worked example

cv\displaystyle c_{v} = 1e-7 m²/s · t\displaystyle t = 1,000,000 s · d\displaystyle d = 2 m

Tv\displaystyle T_{v} = 0.025 · Source: EN 1997-1:2004 Annex F

Scope and standard

Time-dependent settlement and consolidation rate according to EN 1997-1 Annex F.

Standard
EN 1997-1:2004, clause Annex F, Eq. (F.1)
Result
Tv\displaystyle T_{v} (dimensionless)

Reference to clause and equation, no standard text. The description is written in our own words.

Try it

Unit system
Tv\displaystyle T_{v} = 0.025= (1e-7 m²/s) · (1,000,000 s) / (2 m)²

Continue with Mia

Fills the input field in CALC; nothing is sent until you send it.

No matching formula yet? Find the right calculation rule.

Describe what you want to determine. Mia searches the formula catalog first and clarifies assumptions before anything is calculated.

The search starts in Geotechnics › Settlement.

Miaknows the formula catalog and asks for what is missing.

You clarify missing information with Mia in the next step. Nothing is calculated yet.