岩土工程 · 地基沉降
固结时间因数 Tv
太沙基一维固结无量纲时间因数:Tv = cv · t / d²。
Catalog formula, not a design. Check input values, coefficients, and limits against the standard and its national annex.
Formula and quantities
| Symbol | Name | Unit | Note |
|---|---|---|---|
| 固结系数 | m²/s | ||
| 施加荷载后的历时 | s | ||
| 排水路径长度 | m | ||
| 固结时间因数 T_v | – | Result |
实例
= 1e-7 m²/s · = 1,000,000 s · = 2 m
= 0.025 · Source: EN 1997-1:2004 附录 F
Scope and standard
符合EN 1997-1附录F的固结沉降历时与速率计算。
- Standard
- EN 1997-1:2004,第附录 F条,式(F.1)
- Result
- (dimensionless)
Reference to clause and equation, no standard text. The description is written in our own words.
Try it
Continue with Mia
Fills the input field in CALC; nothing is sent until you send it.
No matching formula yet? Find the right calculation rule.
Describe what you want to determine. Mia searches the formula catalog first and clarifies assumptions before anything is calculated.
检索将在 岩土工程 › 地基沉降 开始。
Miaknows the formula catalog and asks for what is missing.