Geotechnics · Settlement
Primary 1D settlement of soil layer s
Primary settlement of a soil layer of thickness h under vertical stress increment: s = δσ,z · h / Es.
Catalog formula, not a design. Check input values, coefficients, and limits against the standard and its national annex.
Formula and quantities
| Symbol | Name | Unit | Note |
|---|---|---|---|
| Average vertical stress increment in layer | kN/m² | ||
| Thickness of soil layer | m | ||
| Oedometric constrained modulus of layer | kN/m² | ||
| Primary settlement of soil layer | m | Result |
Worked example
= 60 kN/m² · = 4 m · = 20,000 kN/m²
= 0.012 m · Source: EN 1997-1:2004 Annex F
Scope and standard
1D settlement analysis of shallow foundations according to EN 1997-1, Annex F.
- Standard
- EN 1997-1:2004, clause F.1, Eq. (F.1)
- Result
- in mm
Reference to clause and equation, no standard text. The description is written in our own words.
Try it
Continue with Mia
- Explain the formulastep by step
- Calculate for my dimensionsenter values, check the result
- Compare with a catalog sectionformula value and table value
Fills the input field in CALC; nothing is sent until you send it.
No matching formula yet? Find the right calculation rule.
Describe what you want to determine. Mia searches the formula catalog first and clarifies assumptions before anything is calculated.
The search starts in Geotechnics › Settlement.
Miaknows the formula catalog and asks for what is missing.