Geotechnics · Settlement
Consolidation time for target time factor Tv (EN 1997-1)
Time required to reach a target consolidation time factor Tv in a clay layer with drainage path Hd and coefficient of consolidation cv: t = (Tv · Hd²) / cv.
Catalog formula, not a design. Check input values, coefficients, and limits against the standard and its national annex.
Formula and quantities
| Symbol | Name | Unit | Note |
|---|---|---|---|
| Dimensionless time factor (e.g. 0.848 for U = 90%) | 1 | ||
| Maximum drainage path length | m | ||
| Coefficient of consolidation | m²/s | ||
| Required consolidation time | h | Result |
Worked example
= 0.848 1 · = 2 m · = 1e-6 m²/s
= 942.22 h
Standard and source
- Standard
- EN 1997-1:2004
- Result
- in h
Reference to clause and equation, no standard text. The description is written in our own words.
Try it
Continue with Mia
- Explain the formulastep by step
- Calculate for my dimensionsenter values, check the result
- Compare with a catalog sectionformula value and table value
Fills the input field in CALC; nothing is sent until you send it.
No matching formula yet? Find the right calculation rule.
Describe what you want to determine. Mia searches the formula catalog first and clarifies assumptions before anything is calculated.
The search starts in Geotechnics › Settlement.
Miaknows the formula catalog and asks for what is missing.