Design · Concrete

Maximum final crack spacing srmax

  • Type: Property
  • Version 1
  • reviewed on 11/10/2026

Maximum crack spacing for members with bonded reinforcement to EN 1992-1-1 Eq. (7.11).

sr,max=k3⋅c+k1⋅k2⋅k4⋅ϕρp,eff\displaystyle s_{r,\mathrm{max}} = k_{3} \cdot c + k_{1} \cdot k_{2} \cdot k_{4} \cdot \frac{\phi}{\rho_{p,\mathrm{eff}}}
Apply in CALC

Catalog formula, not a design. Check input values, coefficients, and limits against the standard and its national annex.

cφsr,max

Formula and quantities

SymbolNameUnitNote
k3\displaystyle k_{3}Cover coefficient (recommended 3.4)–
c\displaystyle cConcrete cover to longitudinal reinforcementmm
k1\displaystyle k_{1}Bond coefficient (0.8 high bond, 1.6 plain)–
k2\displaystyle k_{2}Strain distribution coefficient (0.5 bending, 1.0 pure tension)–
k4\displaystyle k_{4}National parameter (recommended 0.425)–
ϕ\displaystyle \phiBar diametermm
ρp,eff\displaystyle \rho_{p,\mathrm{eff}}Effective reinforcement ratio–
sr,max\displaystyle s_{r,\mathrm{max}}Maximum crack spacingmmResult

Worked example

k3\displaystyle k_{3} = 3.4 · c\displaystyle c = 35 mm · k1\displaystyle k_{1} = 0.8 · k2\displaystyle k_{2} = 0.5 · k4\displaystyle k_{4} = 0.425 · ϕ\displaystyle \phi = 16 mm · ρp,eff\displaystyle \rho_{p,\mathrm{eff}} = 0.015

sr,max\displaystyle s_{r,\mathrm{max}} = 300.33 mm · Source: EN 1992-1-1:2004 Eq. (7.11)

Scope and standard

Reinforced concrete members under tension or bending to EN 1992-1-1.

Standard
EN 1992-1-1:2004, clause 7.3.4 (3), Eq. (7.11)
Result
sr,max\displaystyle s_{r,\mathrm{max}} in mm

Reference to clause and equation, no standard text. The description is written in our own words.

Try it

Unit system
sr,max\displaystyle s_{r,\mathrm{max}} = 300.333 mm= 3.4 · (35 mm) + 0.8 · 0.5 · 0.425 · ((16 mm) / 0.015)

Continue with Mia

Fills the input field in CALC; nothing is sent until you send it.

No matching formula yet? Find the right calculation rule.

Describe what you want to determine. Mia searches the formula catalog first and clarifies assumptions before anything is calculated.

The search starts in Design › Concrete.

Miaknows the formula catalog and asks for what is missing.

You clarify missing information with Mia in the next step. Nothing is calculated yet.