Ontwerp · Beton

Maximale uiteindelijke scheurafstand srmax

  • Type: Eigenschap
  • Versie 1
  • beoordeeld op 10-11-2026

Maximale scheurafstand voor elementen met gehechte wapening volgens EN 1992-1-1 Verg. (7.11).

sr,max=k3⋅c+k1⋅k2⋅k4⋅ϕρp,eff\displaystyle s_{r,\mathrm{max}} = k_{3} \cdot c + k_{1} \cdot k_{2} \cdot k_{4} \cdot \frac{\phi}{\rho_{p,\mathrm{eff}}}
Apply in CALC

Catalog formula, not a design. Check input values, coefficients, and limits against the standard and its national annex.

cφsr,max

Formula and quantities

SymbolNameUnitNote
k3\displaystyle k_{3}Deklaagcoëfficiënt (aanbevolen 3,4)–
c\displaystyle cBetondekking tot langswapeningmm
k1\displaystyle k_{1}Hechtingscoëfficiënt (0,8 ribbelstaal, 1,6 gladstaal)–
k2\displaystyle k_{2}Rekverdelingscoëfficiënt (0,5 buiging, 1,0 zuivere trek)–
k4\displaystyle k_{4}Nationaal parameter (aanbevolen 0,425)–
ϕ\displaystyle \phiStaafdiametermm
ρp,eff\displaystyle \rho_{p,\mathrm{eff}}Effectieve wapeningsverhouding–
sr,max\displaystyle s_{r,\mathrm{max}}Maximale scheurafstandmmResult

Uitgewerkt voorbeeld

k3\displaystyle k_{3} = 3,4 · c\displaystyle c = 35 mm · k1\displaystyle k_{1} = 0,8 · k2\displaystyle k_{2} = 0,5 · k4\displaystyle k_{4} = 0,425 · ϕ\displaystyle \phi = 16 mm · ρp,eff\displaystyle \rho_{p,\mathrm{eff}} = 0,015

sr,max\displaystyle s_{r,\mathrm{max}} = 300,33 mm · Source: EN 1992-1-1:2004 Vgl. (7.11)

Scope and standard

Gewapende betonnen elementen onder trek of buiging volgens EN 1992-1-1.

Standard
EN 1992-1-1:2004, paragraaf 7.3.4 (3), Verg. (7.11)
Result
sr,max\displaystyle s_{r,\mathrm{max}} in mm

Reference to clause and equation, no standard text. The description is written in our own words.

Try it

Unit system
sr,max\displaystyle s_{r,\mathrm{max}} = 300,333 mm= 3,4 · (35 mm) + 0,8 · 0,5 · 0,425 · ((16 mm) / 0,015)

Continue with Mia

Fills the input field in CALC; nothing is sent until you send it.

No matching formula yet? Find the right calculation rule.

Describe what you want to determine. Mia searches the formula catalog first and clarifies assumptions before anything is calculated.

De zoekactie start over Ontwerp › Beton.

Miaknows the formula catalog and asks for what is missing.

You clarify missing information with Mia in the next step. Nothing is calculated yet.