岩土工程 · 地基沉降

固结度 U(t)(初期)

  • 类型:属性
  • 版本1
  • 2026/11/12已审核

初期阶段的平均固结度 (U <= 0.6):U = √(4 · Tv / π)。

U=4⋅Tvπ\displaystyle U = \sqrt{\frac{4 \cdot T_{v}}{\pi}}
Apply in CALC

Catalog formula, not a design. Check input values, coefficients, and limits against the standard and its national annex.

TvU

Try it

U\displaystyle U = 0.356825= sqrt(4 · 0.1 / pi)

Continue with Mia

Fills the input field in CALC; nothing is sent until you send it.

No matching formula yet? Find the right calculation rule.

Describe what you want to determine. Mia searches the formula catalog first and clarifies assumptions before anything is calculated.

检索将在 岩土工程 › 地基沉降 开始。

Miaknows the formula catalog and asks for what is missing.

You clarify missing information with Mia in the next step. Nothing is calculated yet.