岩土工程 · 地基沉降

固结时间因数 Tv

  • 类型:属性
  • 版本1
  • 2026/11/12已审核

太沙基一维固结无量纲时间因数:Tv = cv · t / d²。

Tv=cv⋅td2\displaystyle T_{v} = \frac{c_{v} \cdot t}{d^2}
Apply in CALC

Catalog formula, not a design. Check input values, coefficients, and limits against the standard and its national annex.

dTvtcv

Formula and quantities

SymbolNameUnitNote
cv\displaystyle c_{v}固结系数m²/s
t\displaystyle t施加荷载后的历时s
d\displaystyle d排水路径长度m
Tv\displaystyle T_{v}固结时间因数 T_v–Result

实例

cv\displaystyle c_{v} = 1e-7 m²/s · t\displaystyle t = 1,000,000 s · d\displaystyle d = 2 m

Tv\displaystyle T_{v} = 0.025 · Source: EN 1997-1:2004 附录 F

Scope and standard

符合EN 1997-1附录F的固结沉降历时与速率计算。

Standard
EN 1997-1:2004,第附录 F条,式(F.1)
Result
Tv\displaystyle T_{v} (dimensionless)

Reference to clause and equation, no standard text. The description is written in our own words.

Try it

Unit system
Tv\displaystyle T_{v} = 0.025= (1e-7 m²/s) · (1,000,000 s) / (2 m)²

Continue with Mia

Fills the input field in CALC; nothing is sent until you send it.

No matching formula yet? Find the right calculation rule.

Describe what you want to determine. Mia searches the formula catalog first and clarifies assumptions before anything is calculated.

检索将在 岩土工程 › 地基沉降 开始。

Miaknows the formula catalog and asks for what is missing.

You clarify missing information with Mia in the next step. Nothing is calculated yet.