Geotechnics · Settlement

Hydraulic heave verification ratio (HYD)

  • Type: Verification
  • Version 1
  • reviewed on 11/12/2026

Verification against failure by hydraulic heave (HYD): ηHYD = ud / σd <= 1.0.

ηHYD=udσd\displaystyle \eta_\mathrm{HYD} = \frac{u_{\mathrm{d}}}{\sigma_{\mathrm{d}}}
Apply in CALC

Catalog formula, not a design. Check input values, coefficients, and limits against the standard and its national annex.

udσdηHYD

Formula and quantities

SymbolNameUnitNote
ud\displaystyle u_{\mathrm{d}}Design pore water pressure at bottom of low permeability layerN/m²
σd\displaystyle \sigma_{\mathrm{d}}Design total overburden vertical stressN/m²
ηHYD\displaystyle \eta_\mathrm{HYD}Hydraulic heave verification ratio–Result

Worked example

ud\displaystyle u_{\mathrm{d}} = 40,000 N/m² · σd\displaystyle \sigma_{\mathrm{d}} = 50,000 N/m²

ηHYD\displaystyle \eta_\mathrm{HYD} = 0.8 · Source: EN 1997-1:2004 clause 2.4.7.5

Scope and standard

Hydraulic failure (HYD) limit state according to EN 1997-1 Clause 2.4.7.5 and 10.3.

Standard
EN 1997-1:2004, clause 2.4.7.5, Eq. (2.10)
Result
ηHYD\displaystyle \eta_\mathrm{HYD} (dimensionless)

Reference to clause and equation, no standard text. The description is written in our own words.

Try it

Unit system
ηHYD\displaystyle \eta_\mathrm{HYD} = 0.8= (40,000 N/m²) / (50,000 N/m²)

Continue with Mia

Fills the input field in CALC; nothing is sent until you send it.

No matching formula yet? Find the right calculation rule.

Describe what you want to determine. Mia searches the formula catalog first and clarifies assumptions before anything is calculated.

The search starts in Geotechnics › Settlement.

Miaknows the formula catalog and asks for what is missing.

You clarify missing information with Mia in the next step. Nothing is calculated yet.