Tasarım · Beton

Donatısız minimum kesme dayanımı VRd,c,min

  • Tür: Dayanım
  • Versiyon 1
  • 10.11.2026 tarihinde gözden geçirildi

EN 1992-1-1 Denklem (6.2.b)'ye göre kesme donatısı olmayan elemanların minimum kesme dayanımı.

VRd,c,min=(vmin+k1⋅σcp)⋅bw⋅d\displaystyle V_{\mathrm{Rd},\mathrm{c},\mathrm{min}} = (v_{\mathrm{min}} + k_{1} \cdot \sigma_{cp}) \cdot b_{w} \cdot d
Apply in CALC

Catalog formula, not a design. Check input values, coefficients, and limits against the standard and its national annex.

bwdVRd,c,min

Formula and quantities

SymbolNameUnitNote
vmin\displaystyle v_{\mathrm{min}}Minimum kesme dayanımıN/mm²
k1\displaystyle k_{1}Eksenel yük için gerilme katsayısı–
σcp\displaystyle \sigma_{cp}Eksenel kuvvetten kaynaklanan ortalama basınç gerilmesiN/mm²
bw\displaystyle b_{w}Gövde genişliğimm
d\displaystyle dEtkin yükseklikmm
VRd,c,min\displaystyle V_{\mathrm{Rd},\mathrm{c},\mathrm{min}}Minimum kesme dayanımıkNResult

Çözümlü örnek

vmin\displaystyle v_{\mathrm{min}} = 0,45 N/mm² · k1\displaystyle k_{1} = 0,15 · σcp\displaystyle \sigma_{cp} = 0 N/mm² · bw\displaystyle b_{w} = 300 mm · d\displaystyle d = 500 mm

VRd,c,min\displaystyle V_{\mathrm{Rd},\mathrm{c},\mathrm{min}} = 67,5 kN · Source: EN 1992-1-1:2004 Denk. (6.2.b)

Scope and standard

EN 1992-1-1'e göre kesme donatısı olmayan betonarme elemanlar.

Standard
EN 1992-1-1:2004, madde 6.2.2 (1), Denk. (6.2.b)
Result
VRd,c,min\displaystyle V_{\mathrm{Rd},\mathrm{c},\mathrm{min}} in kN

Reference to clause and equation, no standard text. The description is written in our own words.

Try it

Unit system
VRd,c,min\displaystyle V_{\mathrm{Rd},\mathrm{c},\mathrm{min}} = 67,5 kN= ((0,45 N/mm²) + 0,15 · (0 N/mm²)) · (300 mm) · (500 mm)

Continue with Mia

Fills the input field in CALC; nothing is sent until you send it.

No matching formula yet? Find the right calculation rule.

Describe what you want to determine. Mia searches the formula catalog first and clarifies assumptions before anything is calculated.

Arama Tasarım › Beton içinde başlıyor.

Miaknows the formula catalog and asks for what is missing.

You clarify missing information with Mia in the next step. Nothing is calculated yet.