Ontwerp · Beton

Ponsafschuifweerstand zonder wapening vRd,c

  • Type: Weerstand
  • Versie 1
  • beoordeeld op 10-11-2026

Ontwerpwaarde van de ponsafschuifweerstand langs de basiscontroleomtrek zonder afschuifwapening volgens EN 1992-1-1 Verg. (6.47).

vRd,c=CRd,c⋅k⋅(100⋅ρl⋅fck1 MPa)1/3⋅1 MPa+k1⋅σcp\displaystyle v_{\mathrm{Rd},\mathrm{c}} = C_{\mathrm{Rd},\mathrm{c}} \cdot k \cdot \left(100 \cdot \rho_{l} \cdot \frac{f_{ck}}{1\,\text{MPa}}\right)^{1/3} \cdot 1\,\text{MPa} + k_{1} \cdot \sigma_{cp}
Apply in CALC

Catalog formula, not a design. Check input values, coefficients, and limits against the standard and its national annex.

vRd,c

Formula and quantities

SymbolNameUnitNote
CRd,c\displaystyle C_{\mathrm{Rd},\mathrm{c}}Kalibratiefactor voor ponsen–
k\displaystyle kGrootte-effectfactor voor ponsen–
ρl\displaystyle \rho_{l}Gemiddelde langswapeningsverhouding–
fck\displaystyle f_{ck}Karakteristieke cilinderdruksterkte van betonN/mm²
k1\displaystyle k_{1}Coëfficiënt voor normale spanning in de plaat–
σcp\displaystyle \sigma_{cp}Gemiddelde normale spanning in de plaatN/mm²
vRd,c\displaystyle v_{\mathrm{Rd},\mathrm{c}}Ponsafschuifweerstand zonder wapeningN/mm²Result

Uitgewerkt voorbeeld

CRd,c\displaystyle C_{\mathrm{Rd},\mathrm{c}} = 0,12 · k\displaystyle k = 1,8 · ρl\displaystyle \rho_{l} = 0,012 · fck\displaystyle f_{ck} = 30 N/mm² · k1\displaystyle k_{1} = 0,1 · σcp\displaystyle \sigma_{cp} = 0 N/mm²

vRd,c\displaystyle v_{\mathrm{Rd},\mathrm{c}} = 0,713 N/mm² · Source: EN 1992-1-1:2004 Vgl. (6.47)

Scope and standard

Platen en kolomvoeten onderworpen aan ponsafschuiving volgens EN 1992-1-1.

Standard
EN 1992-1-1:2004, paragraaf 6.4.4 (1), Verg. (6.47)
Result
vRd,c\displaystyle v_{\mathrm{Rd},\mathrm{c}} in N/mm²

Reference to clause and equation, no standard text. The description is written in our own words.

Try it

Unit system
vRd,c\displaystyle v_{\mathrm{Rd},\mathrm{c}} = 0,713216 N/mm²= 0,12 · 1,8 · ((100 · 0,012 · ((30 N/mm²) / 1 [MPa])) ^ (1 / 3)) · 1 [MPa] + 0,1 · (0 N/mm²)

Continue with Mia

Fills the input field in CALC; nothing is sent until you send it.

No matching formula yet? Find the right calculation rule.

Describe what you want to determine. Mia searches the formula catalog first and clarifies assumptions before anything is calculated.

De zoekactie start over Ontwerp › Beton.

Miaknows the formula catalog and asks for what is missing.

You clarify missing information with Mia in the next step. Nothing is calculated yet.