地盤工学 · 沈下
圧密度 U(t) (初期段階)
初期段階の平均圧密度 (U <= 0.6): U = √(4 · Tv / π)。
Catalog formula, not a design. Check input values, coefficients, and limits against the standard and its national annex.
Formula and quantities
| Symbol | Name | Unit | Note |
|---|---|---|---|
| 圧密時間係数 T_v | – | ||
| 平均圧密度 | – | Result |
例題
= 0.1
= 0.35682 · Source: EN 1997-1:2004 付録 F
Scope and standard
EN 1997-1附属書Fに基づく1次元一次圧密解析。
- Standard
- EN 1997-1:2004、付録 F項、式 (F.2)
- Result
- (dimensionless)
Reference to clause and equation, no standard text. The description is written in our own words.